Activities
Activities related to a project design can be specified into various basic stages:
Conceptual Phase:
Opportunity study
Feasibility study
Assertment of a mineable reserves
Extraction technology
Mine and/or mine level development
Economic assessment
Personnel requirements
Implementation schedules
Design Phase:
Shaft sinking and large underground works designs
Mine development layout
Detailing of vertical and horizontal transport technology
Ventilation and air-conditioning layout
Mine pumping system
Power supply design
Construction Phase:
Program of construction control
Mediation of associated charges and services
Project implementation supervision
Routine Phase:
Technical supervision of a start-up
Technical maintenance cycle - advising
Intermittent checks and audits as agreed
Elaboration of emergency plans
Connected Activities:
Mining subsidence effects and compensation measures at engineering structures
Technical designs of winding-up a mine and its sealing
Projects of alternative use of abandoned mines
The Company is very well equipped with both hardware and software means. It has also high experience in mine surveying branch. Therefore company develops its activities in the field of
Geographic Information Systems (GIS):
Drawing-up of a digital map covering the area of interest ( creation of vector maps from raster patterns)
Text and numerical data entry including their introduction into databases and their consequent utilization
Interconnection between graphic data and databases
Procurement of the required software and hardware to operate GIS including user's training